Ovacık Mahallesi, Kullar Caddesi No: 241 C1 Blok, 41000 Başiskele/Kocaeli
21 Dec
We have commissioned our wastewater treatment plant project with a capacity of 120 m3/day. The facility consists of Physical treatment, Chemical treatment, Sand filter, Biological treatment, MBR, Carbon filter and osmosis system. The recovered water with a recovery efficiency of over 75% is used for the water needs of the machines in the factory.
We would like to thank our Moroccan business partners for their interest.