Ovacık Mahallesi, Kullar Caddesi No: 241 C1 Blok, 41000 Başiskele/Kocaeli
PROJECT DETAIL | |
Sector | Plastic Recovery |
Location | Düzce |
Capacity | 2 m3/day |
Process | Physical+ Chemical + Membrane Biorector + Filtration + R.O. System + Sludge Dewatering |
Date | 2023 |
Input Parameters | COD = 9.800 mg/lt Conductivity = 9000 mikrosiemens/cm TSS = 25.000 mg/lt |
Çıkış Parametreleri | COD <10 mg/lt Conductivity <250 mikrosiemens/cm TSS < 1 mg/lt |